 Post subject: Proposed Hydro-electric activity in Augrabies / Riemvasmaak
Unread postPosted: Wed Apr 10, 2013 7:38 am 
Offline
Senior Virtual Ranger
Senior Virtual Ranger
User avatar

Joined: Sat Jan 29, 2005 12:52 pm
Posts: 1731
Location: My business...
This seems to be the latest project going on:

First the bit from BEELD for which I'm not yet able to find an English translation.

http://www.beeld.com/Suid-Afrika/Nuus/Kragsentrale-in-park-beoog-20130409

Did find this on the net:

http://aurecon.webfoundryza.com/assets/files/108361riemvasmaak/108361_Draft%20Exec%20Summ.pdf

http://aurecon.webfoundryza.com/assets/files/108361riemvasmaak/Annexure_D_Specialist_Reports/Ann%20D5_Screening%20SIA_Final.pdf


Top
 Profile  
 
 Post subject: Re: Proposed Hydro-electric activity in Augrabies / Riemvasm
Unread postPosted: Wed Apr 10, 2013 7:47 am 
Offline
Virtual Ranger
Virtual Ranger

Joined: Sun Apr 12, 2009 6:20 am
Posts: 1046
Here is the not so good English translation:

Hydroelectricity in the foreseeable future be raised in the Augrabies National Park. Stakeholders already been approached and a submission to tackle the R700 million project will be done in August 2014 to the government, director Niel Theron Hydro SA said on Wednesday. proposed project will include a weir and piping water from the Orange River to a hydroelectric power station on the basis of SANParks and the Riemvasmaak Trust will result. the pipeline will be a existing gravel submitted, Theron said. "This is a road which the public currently do not have access without the consent of SANParks. Once submitted, we will repair the road. " plan to the hydroelectric power station deep underground in a divide near Riemvasmaak build and the last 100m to the water turbines may fall, but also that the project not onaansienlik in the environment. watercourse a bit further back in the Orange River. Riemvasmaak hydroelectric project will generate 19.9 MW and with another project, the Nose Mountain project, the construction starting next month, electricity to all Kakamas. The lowest river flows in the Augrabies Falls is 30 cu. m / s to 35 cu. m / s, Theron said. "We take only after this amount of water (18.5 cu. m / s) and then get the waterfall everything. Everyone says we're going to build a pond to the waterfall, but it is not true. " In every walk the river at the Augrabies Falls at 110 cu. m / s. "I realize there are people who are upset, but I do not think they understand what we want to do. We will not take away the waterfall, and it is also an industry that we are going to build. " weir of 2.5 m high above the waterfall in the river. "It will always be under water unless there is a drought," said Theron. weir is required to turn water into the pipeline to serve the power station. "All people will be able to see a substation." Tourists at the waterfall will not see it, according to a brochure. bid for the project in August 2014 submitted to the Department of Energy.

_________________
NO TO TRADE IN RHINO HORN!


Top
 Profile  
 
 Post subject: Hydro Electric Power Station near Augrabies.
Unread postPosted: Wed Apr 10, 2013 8:34 am 
Offline
Senior Virtual Ranger
Senior Virtual Ranger
User avatar

Joined: Tue Dec 25, 2007 4:52 pm
Posts: 2514
Location: VEREENIGING
Article in Beeld this morning:

Unfortunately I cannot post the map, it can be viewed at: http://www.beeld.com/Suid-Afrika/Nuus/K ... g-20130409

Kragsentrale in park beoog
2013-04-09 23:00
Elsabé Brits
Kaapstad. – Hidro-elektrisiteit kan in die afsienbare toekoms in die Augrabies-nasionale park opgewek word.

Belanghebbendes word reeds genader en ’n voorlegging om die projek van R700 miljoen te pak gaan in Augustus 2014 aan die regering gedoen word, het Niel Theron, direkteur van Hydro SA, gister gesê.

Die beoogde projek sal onder meer bestaan uit ’n stuwal en ’n pypleiding wat water uit die Oranjerivier na ’n hidro-elektriese kragsentrale op grond van SANParke en die Riemvasmaak-trust sal lei.

Die pypleiding sal ónder ’n bestaande gruispad gelê word, het Theron gesê. “Dit is ’n pad waartoe die publiek tans nie toegang het sonder SANParke se toestemming nie. Nadat dit gelê is, sal ons die pad herstel.”

Die plan is om die hidro-elektriese kragsentrale diep onder die grond in ’n kloof naby Riemvasmaak te bou sodat die water uiteindelik 100 m tot by die turbines kan val, maar ook sodat die projek nie onaansienlik in die omgewing is nie.

Die water loop ’n ent verder terug in die Oranjerivier.

Die Riemvasmaak- hidro-elektriese projek sal 19,9 MW opwek en kan saam met ’n ander projek, die Neusberg-projek, waarvan die bouwerk volgende maand begin, elektrisiteit aan die hele Kakamas voorsien.

Die laagste wat die rivier oor die Augrabies-waterval vloei, is 30 kub. m/s tot 35 kub. m/s, het Theron gesê.

“Ons neem eers ná dié hoeveelheid water (18,5 kub. m/s) en daarna kry die waterval weer alles. Almal sê ons gaan ’n dam voor die waterval bou, maar dit is nie waar nie.”

Op sy volste loop die rivier by die Augrabies-waterval teen 110 kub. m/s.

“Ek besef daar is mense wat ontsteld is, maar ek dink nie hulle verstaan wat ons wil doen nie. Ons gaan nié die waterval wegvat nie en dit is ook nie ’n nywerheid wat ons gaan oprig nie.”

’n Stuwal van 2,5 m hoog sal ver bokant die waterval in die rivier gebou word. “Dit sal altyd onder die water wees tensy daar ’n groot droogte is,” het Theron gesê.

Die stuwal is nodig om water af te keer na die pypleiding wat die kragsentrale moet bedien. “Al wat mense sal kan sien, is ’n substasie.” Toeriste by die waterval sal dit egter nie kan sien nie, lui ’n inligtingstuk.

Die bod vir die projek sal in Augustus 2014 by die departement van energie ingedien word.

Power station planned for Park.
2013-04-09 23:00
Elsabé Brits

Cape vTown – Hydro electricity could be generated in the Augrabies National Park.
Niel Theron of Hydro SA yesterday said that stakeholders are already being requested to submit proposals for the submission of their proposals to the Government this project of R700 million by 2014.

The planned project will include a weir and pipeline that will route water from the Gariep River to a hydro electric power station on land belonging to SANParks and the Riemvasmaak- trust.
Theron said that the pipeline will be underneath the existing restricted gravel road which the public do not have access to without SANParks permission.

The plan is that the planned hydro electric power station will be built subsurface in a gorge near Riemvasmaak in order that the water would drop 100 m onto the turbines in order not to interfere with the environmental aesthetics of the area.

The used water will then be rerouted back into the Gariep River.

The Riemvasmaak hydro electric project will generate 19,9 MW and will together with the Neusberg – project which will commence next week, supply electricity to the whole of the Kakamas area.

Theron stated that the lowest water flow over the Augrabies falls is 30 - 35 cub m/s, 18.5 cub m/s will be extracted for the power station. They will not be building a dam above the falls as currently being speculated by the public. The peak flow of the Gariep River is 110 cub m/s.

Theron said that it is understandable that people will be upset about this, but they should also understand that the Augrabies falls will not be removed and that they are not planning to build an industry there.

The weir will be 2.5 m in height and will be upstream in the river above the falls. Except for extreme drought periods the weir will always be sub surface. The weir is required to reroute the water to the pipeline supplying the power station. All that will be visible will be is a sub-station, according to information document this will not be visible to visitors to the falls.

The bid for this project is to be submitted to the Department of Energy in August 2014.

_________________
I participate because I care - CUSTOS NATURAE
No to Hotels in and commercialization of our National Parks.
No to Legalized Rhino and Lion trade.
Done 144 visits to National Parks.
What a wonderful privilege.


Top
 Profile  
 
 Post subject: Re: Hydro Electric Power Station near Augrabies.
Unread postPosted: Wed Apr 10, 2013 8:40 am 
Offline
Moderator
Moderator
User avatar

Joined: Sat Feb 18, 2006 12:30 am
Posts: 39016
Location: Worcester, South Africa
An existing thread on this topic here, Gmlsmit.

I will merge your post to it.

_________________
aquila non capit muscas


Top
 Profile  
 
 Post subject: Re: Proposed Hydro-electric activity in Augrabies / Riemvasm
Unread postPosted: Wed Apr 10, 2013 9:17 am 
Offline
Senior Virtual Ranger
Senior Virtual Ranger
User avatar

Joined: Tue Dec 25, 2007 4:52 pm
Posts: 2514
Location: VEREENIGING
Thanks :thumbs_up:

_________________
I participate because I care - CUSTOS NATURAE
No to Hotels in and commercialization of our National Parks.
No to Legalized Rhino and Lion trade.
Done 144 visits to National Parks.
What a wonderful privilege.


Top
 Profile  
 
 Post subject: Threat to Augrabies Falls NP
Unread postPosted: Thu May 16, 2013 8:40 am 
Offline

Joined: Sun May 11, 2008 2:07 pm
Posts: 66
I have seen recent media coverage about the threat of the Kakamas hydrogeneration power scheme to Augrabies Falls NP. This scheme will result in a decrease in waterflow to Augrabies Falls NP with a potential negative impact on the vegetation and ecosystems in the park. Augrabies Falls NP is one of our national assets and we need to protect it for generations to come.


Top
 Profile  
 
 Post subject: Re: Threat to Augrabies Falls NP
Unread postPosted: Thu May 16, 2013 8:52 am 
Offline
Forum Assistant
Forum Assistant
User avatar

Joined: Tue Oct 06, 2009 5:03 pm
Posts: 10235
Location: Upington RSA
FAC Member (2012)
Elmar have a look here on some discussions

Proposed Hydro-electric activity in Augrabies / Riemvasmaak

_________________
You only live once, but if you do it right, once is enough - Mae West


Top
 Profile  
 
 Post subject: Re: Threat to Augrabies Falls NP
Unread postPosted: Thu May 16, 2013 5:08 pm 
Offline

Joined: Sun May 11, 2008 2:07 pm
Posts: 66
Are anything being done to stop this? Can the public perhaps assist Sanparks in drawing up a petition? Augrabies Falls is a national asset and while many people will support more environmentally friendly electricity, I do not support it at the expense of a national asset.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 8 posts ] 



Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

Webcams Highlights

Addo Nossob Orpen Satara
Addo Nossob Orpen Satara
Submitted by swartj at 19:10:55 Submitted by tomdchef at 19:37:08 Submitted by tomdchef at 17:55:10 Submitted by vinkie at 18:13:52